AC, DC, and three generators

Two networks, one of them generated

The aeroplane has a three-phase 115/200 V 400 Hz constant-frequency AC system and a 28 V DC system. In normal configuration only AC is generated: the generators produce AC, and part of it is converted into DC for the equipment that needs it.

There are three main generators - one on each engine and one on the APU - and each of them, on its own, can supply every bus bar on the aeroplane. They are never connected in parallel. At any moment a given AC bus has exactly one source, and much of this module is learning which one.

A320 electrical network - generation and distributionRUNNINGGEN 1OFFAPU GENEXT PWRRUNNINGGEN 2AC BUS 1BUS TIEAC BUS 2TR 1AC ESS BUSAC SHED ESSOFFRATOFFEMER GENTR 2OFFSTAT INVESS TRDC BUS 1DC BAT BUSDC BUS 2DC ESS BUSDC SHED ESSHOT BUS 1BAT 1BAT 2HOT BUS 2
  • GEN 1: Engine 1 generator - driven through an integrated drive (IDG), up to 90 KVA of three-phase 115/200 V 400 Hz, controlled by its own GCU.
  • APU GEN: APU generator - the same output as an engine generator, and can replace either or both of them at any time.
  • EXT PWR: External power - plugged in at the connector near the nosewheel; has priority over the APU generator when the EXT PWR pushbutton is ON.
  • GEN 2: Engine 2 generator - identical to GEN 1, and normally supplies AC BUS 2.
  • AC BUS 1: AC BUS 1 - normally supplied by GEN 1 through its generator line contactor (GLC 1).
  • BUS TIE: Bus tie contactors - open or close automatically to keep both AC busses powered. The APU generator and external power reach the AC busses through them.
  • AC BUS 2: AC BUS 2 - normally supplied by GEN 2 through GLC 2.
  • TR 1: Transformer rectifier 1 - up to 200 A of DC from AC BUS 1. Normally supplies DC BUS 1, the DC BAT BUS and the DC ESS BUS.
  • AC ESS BUS: AC essential bus - normally from AC BUS 1; from AC BUS 2 with AC ESS FEED at ALTN; from the emergency generator, or the static inverter, when both main AC busses are lost.
  • AC SHED ESS: AC shed essential bus - hangs off the AC ESS BUS, stays powered on the emergency generator, and is shed automatically when only the batteries are left.
  • RAT: Ram air turbine - extends automatically when AC BUS 1 and AC BUS 2 are both unpowered and speed is above 100 kt, and pressurises the blue hydraulic system that drives the emergency generator.
  • EMER GEN: Emergency generator - turned by a hydraulic motor on the blue circuit; 5 KVA of three-phase 115/200 V 400 Hz. Supplies the AC ESS BUS, and the DC ESS BUS through the ESS TR.
  • TR 2: Transformer rectifier 2 - up to 200 A of DC from AC BUS 2. Normally supplies DC BUS 2.
  • STAT INV: Static inverter - turns DC from battery 1 into 1 KVA of single-phase 115 V 400 Hz AC for part of the AC essential network, when only the batteries are left.
  • ESS TR: Essential transformer rectifier - identical to TR 1 and TR 2; powers the DC ESS BUS if all engine and APU generators fail, or if TR 1 or TR 2 fails.
  • DC BUS 1: DC BUS 1 - normally from TR 1; from DC BUS 2, automatically after 5 s, if AC BUS 1 is lost.
  • DC BAT BUS: DC battery bus - normally supplied through TR 1; the batteries connect to it to charge, for an APU start, and on the ground below 100 kt when the main AC busses are lost.
  • DC BUS 2: DC BUS 2 - normally from TR 2.
  • DC ESS BUS: DC essential bus - normally through TR 1; from the ESS TR when a TR or the main generation is lost; from battery 2 when only the batteries are left.
  • DC SHED ESS: DC shed essential bus - hangs off the DC ESS BUS, and is shed automatically when only the batteries are left.
  • HOT BUS 1: Hot bus 1 - permanently connected to battery 1, so it stays powered in every configuration.
  • BAT 1: Battery 1 - 23 Ah, with its own battery charge limiter. With no AC generation left it supplies the static inverter.
  • BAT 2: Battery 2 - 23 Ah, with its own battery charge limiter. With no AC generation left it supplies the DC ESS BUS.
  • HOT BUS 2: Hot bus 2 - permanently connected to battery 2.
Redrawn from FCOM DSC-24-10-20, DSC-24-10-30 and DSC-24-20 (Generation, Operations, Controls and Indicators), bus supplies per the Distribution Table, Ident. DSC-24-10-30-40-00017765.0002001 / 10 MAY 21, Applicable to: ALL - structure restated, not traced. LTM A319/A320/A321 FLEET FCOM, 02 MAY 23.

Which statement about the three main generators is true?

Any one of them can supply the whole network, and they are never paralleled. Correct. "Each generator can provide AC power to all electrical bus bars", and "The generators cannot be connected in parallel."

Where the DC comes from

DC is made from AC by transformer rectifiers. Two main TRs, TR 1 and TR 2, each supply up to 200 A: TR 1 from AC BUS 1, TR 2 from AC BUS 2.

A third, identical one - the ESS TR - exists for the essential DC network. It powers it from the emergency generator if every engine and APU generator has failed, and it also steps in if TR 1 or TR 2 fails. Each TR controls its own contactor by internal logic.

Every source on the aeroplane

Engine generators, the APU and ground power

Each engine drives its generator through an integrated drive - the IDG - for up to 90 KVA. A generator control unit (GCU) per generator holds its frequency and voltage and protects the network by controlling that generator’s line contactor.

The APU generator produces the same output and can replace either or both engine generators at any time. On the ground, external power plugs in near the nosewheel and can supply every bus bar.

The IDG can be disconnected from its driveshaft by the guarded IDG pushbutton. Its FAULT light comes on for an oil outlet overheat above 180 °C or low oil pressure, and above 200 °C the IDG disconnects itself.

IDG 1 is disconnected in flight with the IDG 1 pushbutton. Who can reconnect it?

Only maintenance personnel. Correct - "only maintenance personnel can reconnect it". Which is why the FCOM adds two cautions: do not hold the pushbutton more than 3 s, and disconnect only with the engine running or windmilling.

The two emergency sources

If all main generators fail, the blue hydraulic circuit drives an emergency generator that supplies AC automatically: 5 KVA, three-phase 115/200 V 400 Hz - a small fraction of one IDG, which is why only the essential network gets it.

If there is no AC at all, the batteries are the last source. A static inverter turns DC from battery 1 into 1 KVA of single-phase 115 V 400 Hz AC for part of the AC essential bus. Above 50 kt it switches on automatically whenever only the batteries are supplying the aeroplane, whatever the BAT pushbuttons say; below 50 kt it also needs both BAT 1 and BAT 2 on.

Two batteries, disconnected most of the time

Two 23 Ah batteries are permanently connected to the two hot busses, so those stay powered whatever else happens. Getting onto the DC BAT BUS is a different matter: each battery has a battery charge limiter (BCL) that opens and closes its line contactor.

In normal configuration the batteries are disconnected most of the time. The BCL connects them for an APU start, to charge when battery voltage falls below 26.5 V - immediately on the ground, after 30 minutes in flight - and when both AC busses are lost below 100 kt.

Normal cruise, both engine generators on line. Where are the batteries connected?

To their hot busses always, and to the DC BAT BUS only when the BCL connects them. Correct. The hot-bus connection is permanent; the DC BAT BUS connection is made by the battery charge limiter - to charge, for an APU start, or on the loss of AC below 100 kt.

Normal distribution, and who has priority

Normal configuration, in flight

Each engine generator supplies its own AC bus through its generator line contactor: GEN 1 to AC BUS 1 through GLC 1, GEN 2 to AC BUS 2 through GLC 2. AC BUS 1 normally supplies the AC ESS BUS.

On the DC side, TR 1 normally supplies DC BUS 1, the DC BAT BUS and the DC ESS BUS; TR 2 supplies DC BUS 2. Notice the asymmetry - both essential busses hang off side 1.

Priority, and the bus tie

The priority order is fixed. Engine generators, when running, beat everything. External power beats the APU generator when the EXT PWR pushbutton is ON. The EXT PWR ON light stays on even after the engine generators take over - so ON is not evidence that ground power is carrying.

The APU generator and external power reach the AC busses through the bus tie contactors, which open and close automatically to keep both AC busses powered: one closed when one engine generator runs its own side and the APU or ground power runs the other; both closed on a single engine generator, on the APU generator, or on external power.

On the stand: APU generator on line, then ground power connected and the EXT PWR pushbutton pressed ON. What supplies the network?

External power. Correct. External power beats the APU generator. It will in turn give way to the engine generators after start.

A generator, a bus or a TR lost

One engine generator lost

The system replaces a failed generator automatically - with the APU generator if it is available, otherwise with the other engine generator. Part of the galley load is shed automatically at the same time.

The picture shows the harder of the two cases, with the APU not running. GEN 2 now carries everything: its line contactor feeds AC BUS 2, and the two bus tie contactors carry that same power across to AC BUS 1. Every bus GEN 1 was supplying is now on GEN 2.

GEN 1 fails in cruise with the APU running and its generator available. What takes over?

The APU generator. Correct. The failed generator is replaced by the APU generator if available, and only otherwise by the other engine generator.

AC BUS 1 lost

Losing the bus itself is different from losing a generator, because the essential busses hang off side 1. Three things have to happen.

AC BUS 2 takes over the AC ESS BUS, and the ESS TR takes over the DC ESS BUS - both through the AC ESS FEED switching. AC ESS FEED auto switching is an option, and the FCOM's list of installed equipment records it as fitted on all 49 of this course's airframes. So on this aeroplane AC BUS 2 takes over the AC ESS BUS by itself. Selecting the AC ESS FEED pushbutton to ALTN does the same thing by hand. Separately, and automatically after 5 seconds, DC BUS 2 picks up DC BUS 1 and the DC BAT BUS.

AC BUS 1 is lost in flight. On this course's aeroplane, how does AC BUS 2 come to supply the AC ESS BUS?

Automatically. AC ESS FEED auto switching is fitted on every aeroplane in this course. Correct. The FCOM's installed-equipment list marks it fitted for all 49 airframes. With it, AC BUS 2 supplies the AC ESS BUS when AC BUS 1 is lost.

One TR lost

A TR’s contactor opens automatically on overheat or on minimum current. The other main TR then replaces it - in the picture, TR 2 picks up DC BUS 1 and the DC BAT BUS - and the ESS TR supplies the DC ESS BUS.

Lose both TR 1 and TR 2 and DC BUS 1, DC BUS 2 and the DC BAT BUS are all lost; the DC ESS BUS survives on the ESS TR.

What opens a TR’s contactor automatically?

Overheat, or minimum current. Correct. Either one opens that TR’s contactor, the other TR replaces it, and the ESS TR takes the DC ESS BUS.

The emergency configuration

Both AC busses lost, above 100 kt

If AC BUS 1 and AC BUS 2 are both lost and the aeroplane is above 100 kt, the RAT extends automatically. It pressurises the blue hydraulic system, which turns the emergency generator through a hydraulic motor. The emergency generator then supplies the AC ESS BUS, and the DC ESS BUS through the ESS TR.

That takes time - about 8 seconds for RAT extension and generator coupling - and the batteries carry the essential network in between. Note what is still powered once it couples: both SHED busses. Shedding is for batteries only.

From the electrical system’s side, the RAT extends automatically when…

AC BUS 1 and AC BUS 2 are both unpowered and speed is above 100 kt. Correct. All three conditions. The crew can also extend it at any time with MAN ON.

Batteries only

If the RAT stalls, or the aeroplane is below 100 kt, nothing is driving the emergency generator. The essential network transfers to the batteries and the static inverter, and the AC SHED ESS and DC SHED ESS busses are shed automatically.

Battery 1 drives the static inverter, which supplies the AC ESS BUS above 50 kt. Battery 2 supplies the DC ESS BUS. On the ground the network narrows further: below 100 kt the DC BAT BUS is connected to the batteries, and below 50 kt the AC ESS BUS is shed - and with it every display unit.

Batteries only, after landing. What happens as the aeroplane decelerates through 50 kt?

The AC ESS BUS is shed, and every display unit goes with it. Correct. "Below 50 kt, AC ESS BUS is automatically shed, leading to the loss of all display units." The 100 kt event came earlier: the DC BAT BUS connected to the batteries.

The numbers

The numbers this module is examined on
QuantityValue
AC systemthree-phase 115/200 V, 400 Hz
DC system28 V
Engine and APU generatorsup to 90 KVA each
Emergency generator5 KVA
Static inverter1 KVA, single-phase 115 V 400 Hz
TR 1, TR 2, ESS TRup to 200 A each
Batteriestwo, 23 Ah each
RAT automatic extensionboth AC busses lost, above 100 kt
RAT extension and emergency generator couplingabout 8 s, on batteries
AC ESS BUS shed on batteries, on the groundbelow 50 kt
Battery charging startsbelow 26.5 V
IDG pushbutton - never hold longer than3 s

What does the static inverter supply?

1 KVA of single-phase 115 V 400 Hz AC, from battery 1. Correct, to part of the AC essential bus. Single-phase, and a fifth of what the emergency generator makes.